We served as a sub-consultant for this facility which included a 0.15-MG Spheroid EST, 0.15-MG welded steel GST, pump station, building, 150kW generator, and driveway.
Upon site assessment and project evaluation, we wanted our design to address the crucial problem of bringing centralized wastewater service to a community previously relying on individual septic systems. Systems that are often past their life expectancy, i
We served as primary consultant for this project requiring a new 0.5-MG Elevated Storage Tank, access drive, new 24” water transmission line to the existing water system, and 8’ fencing.
We served as a sub-consultant for this 1-MG Composite Elevated Storage Tank, which will serve 4,000 single-family homes, access driveway, 8’ high fencing, and pumps and motors for a booster station.
Southwest Engineers provided design and construction-phase assistance services for the Carpenter Hill Lift Station and its force main. This lift station consists of a 6’ diameter, 17’ deep polymer-concrete wet well with two 145 gpm submersible pumps. T